Mounting - Wall

The GH wall brackets are used to install all types of rail between vertical surfaces.

The bracket can be used, for example, in connection with installing room-covering rail systems in rooms where the ceiling is inaccessible or slanting and where it is not possible to install reinforcements with the GH stabiliser bracket.
The GH wall bracket can be installed on all types of wall – both brick and concrete, lightweight concrete, wood and plasterboard. But the GH wall bracket must be combined with a GH plasterboard bracket on plasterboard walls without wall reinforcement.

Installation
The GH wall bracket must be secured to the wall with two bolts.

Note
The GH wall brackets can be used either for side-mounted rails or for end-mounted rails.

Exception
Must not be used in systems with a maximum load over 250 kg.

GH plasterboard bracket

Use

The GH plasterboard bracket is used as an adapter for the GH wall bracket in connection with installations on plasterboard walls or other types of light wall. A GH plasterboard bracket provides the necessary high stability and strength to install rail systems on plasterboard walls.
But it is a requirement that these are double plasterboard walls at least 24 mm thick.
Installation surface (WxH) 303x303 mm.

Installation
The GH plasterboard bracket can be secured direct to the plasterboard wall with four Fischer HM 5x65 S. The GH wall bracket must then be secured to the two threaded rods on the GH plasterboard bracket with 10 mm nuts and, if necessary, lock nuts.

Exception
Must not be used in systems with a maximum load over 250 kg.

The GH wall bracket must be secured to the wall with two bolts.